Skip to content

2018 12 19_meeting

Michael Wetter edited this page Dec 19, 2018 · 2 revisions

SOEP Coordination meeting

Date: December 19 2018, 8:15am-9am Pacific Times

The purpose of this meeting is to coordinate the Modelica integration for SOEP.

Meeting information

Join from PC, Mac, Linux, iOS or Android: https://lbnl.zoom.us/my/mwetter

Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#

Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 661 404 2296 International numbers available: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8

Agenda

  1. Previous action items.
  2. Michael: Modelon visit
  3. Michael: Building Simulation paper.
  4. Kyle, Michael: Refactoring room air heat and mass balance, and connecting to Modelica.
  5. Kyle, Michael: Optimica license protection.
  6. Michael: JSON representation for OS front-end to Modelica
  7. Stuart: FMI-QSS.
  8. Michael: CI testing (funnel)
  9. Other items

Participants

Brian Ball
Kyle Benne
Antoine Gautier
Jianjun Hu
Amir Roth
Bo Shen
Michael Wetter
Kun Zhang

Minutes

Modelon visit

Michael presented summary of visit last week.

Building Simulation paper

Work towards a journal paper.

Refactoring room air balance

See https://github.com/lbl-srg/modelica-buildings/issues/1129#issuecomment-393285857 for open tasks.

Kyle to work on packaging Spawn on all platforms, for now with JModelica rather than OCT.

EnergyPlus I/O variables

Michael works on specification.

Optimica license protection

Need to schedule in January to move this forward.

JSON representation for OS front-end to Modelica

Jianjun to work on graphical output (svg) and on JSON schema.

FMI-QSS

Michael to formalize specification of event indicator in modelDescription.xml file.

CI testing (funnel)

Antoine works on test cases for funnel and on integration testing for different operating systems.

Other items

None.

New action items

Work on subcontracts.

Previous action items

Kyle to look into library unloading and missing time step issue.

Multiple FMUs: Kyle to work on accessing variables.

Michael to scope how to access controls I/O, building on external interface.

Jianjun to work on JSON representation for Modelica HVAC that could become the basis for a schema-driven editor.

Clone this wiki locally