Skip to content

Merge #6278: perf: reduced delays and syncs in functional tests to ru… #529

Merge #6278: perf: reduced delays and syncs in functional tests to ru…

Merge #6278: perf: reduced delays and syncs in functional tests to ru… #529

Triggered via push September 25, 2024 14:34
Status Cancelled
Total duration 2h 35m 1s
Artifacts 1

build.yml

on: push
Build Image
33s
Build Image
Matrix: Build Dependencies
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Build (linux64_tsan, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_tsan, x86_64-pc-linux-gnu)
The operation was canceled.
Build (linux64_cxx20, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_cxx20, x86_64-pc-linux-gnu)
The operation was canceled.
Build (linux64_ubsan, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_ubsan, x86_64-pc-linux-gnu)
The operation was canceled.
Build (linux64_sqlite, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_sqlite, x86_64-pc-linux-gnu)
The operation was canceled.
Build (linux64_nowallet, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_nowallet, x86_64-pc-linux-gnu)
The operation was canceled.
Build (linux64, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64, x86_64-pc-linux-gnu)
The operation was canceled.
Build (arm-linux, arm-linux-gnueabihf)
The run was canceled by @PastaPastaPasta.
Build (arm-linux, arm-linux-gnueabihf)
The operation was canceled.
Build (linux64_fuzz, x86_64-pc-linux-gnu)
The run was canceled by @PastaPastaPasta.
Build (linux64_fuzz, x86_64-pc-linux-gnu)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dashpay~dash~LS98ZF.dockerbuild
20.4 KB