Skip to content

Wazuh changes

Wazuh changes #2

Triggered via pull request October 1, 2024 10:53
Status Cancelled
Total duration 58s
Artifacts

ci.yaml

on: pull_request
Matrix: Build charm
Lint  /  Lint .github/workflows/
4s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
22s
Lint / tox run -e lint
Unit test charm
28s
Unit test charm
Check libraries
16s
Check libraries
Integration test charm | 3.5.3  /  collect-integration-tests
Integration test charm | 3.5.3 / collect-integration-tests
Matrix: Integration test charm | 3.5.3 / integration-test
Waiting for pending jobs
Integration test charm | 3.5.3  /  (beta) Publish Allure report
Integration test charm | 3.5.3 / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Check libraries
Canceling since a higher priority waiting request for 'Tests-refs/pull/2/merge' exists
Check libraries
The operation was canceled.
Build charm (.) / Collect bases for charm | .
Canceling since a higher priority waiting request for 'Tests-refs/pull/2/merge' exists
Build charm (.) / Collect bases for charm | .
The operation was canceled.
Lint / tox run -e lint
Canceling since a higher priority waiting request for 'Tests-refs/pull/2/merge' exists
Lint / tox run -e lint
The operation was canceled.
Unit test charm
Canceling since a higher priority waiting request for 'Tests-refs/pull/2/merge' exists
Unit test charm
The operation was canceled.