Scheduled spread tests #166
spread-scheduled.yaml
on: schedule
snap-build
8m 29s
remote-build
2h 18m
Matrix: kernel-plugins
Annotations
4 errors and 2 warnings
kernel-plugins (v2)
Process completed with exit code 1.
|
remote-build
unable to access 'https://github.com/canonical/snapcraft/': gnutls_handshake() failed: The TLS connection was non-properly terminated.
|
remote-build
unable to access 'https://github.com/canonical/snapcraft/': SSL connection timeout
|
remote-build
Process completed with exit code 1.
|
remote-build
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/692973e3d937129bcbf40652eb9f2f61becf3332'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
remote-build
Back off 12.051 seconds before retry.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
snap
|
70.5 MB |
|