chore(deps): update dependency pydantic to v2.9.2 #7
integration_test.yaml
on: pull_request
integration-tests
/
Plan
4s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
3 errors
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
|
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-07-17T13-21-25-b022__build__output__charm__irc-bridge
|
9.75 MB |
|
2024-07-17T13-21-25-b022__plan
|
296 Bytes |
|