Skip to content

chore(deps): update dependency ops to v2.16.1 #6

chore(deps): update dependency ops to v2.16.1

chore(deps): update dependency ops to v2.16.1 #6

Triggered via pull request July 17, 2024 13:21
Status Failure
Total duration 11m 13s
Artifacts 2

integration_test.yaml

on: pull_request
integration-tests  /  Plan
11s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Plan Image Scanning
2s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

3 errors
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
2024-07-17T13-21-18-aa09__build__output__charm__irc-bridge
9.72 MB
2024-07-17T13-21-18-aa09__plan
296 Bytes