chore(deps): update dependency ops to v2.16.1 #39
integration_test.yaml
on: pull_request
integration-tests
/
Plan
6s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
2 errors
integration-tests / Build charm (irc-bridge)
The process '/snap/bin/charmcraft' failed with exit code 1
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-09-25T06-44-18-b244__plan
|
296 Bytes |
|