Skip to content

chore(deps): update dependency ops to v2.16.1 #39

chore(deps): update dependency ops to v2.16.1

chore(deps): update dependency ops to v2.16.1 #39

Triggered via pull request September 25, 2024 06:44
Status Failure
Total duration 5m 38s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  Plan
6s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests  /  Plan Image Scanning
0s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

2 errors
integration-tests / Build charm (irc-bridge)
The process '/snap/bin/charmcraft' failed with exit code 1
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
2024-09-25T06-44-18-b244__plan
296 Bytes