Skip to content

Fixing upgrade N-1 error #1931

Fixing upgrade N-1 error

Fixing upgrade N-1 error #1931

Triggered via pull request July 26, 2023 20:42
Status Cancelled
Total duration 9m 15s
Artifacts 5

kind.yml

on: pull_request
Check whether tests need to be run based on diff
17s
Check whether tests need to be run based on diff
Build ClickHouse monitor image to be used for Kind e2e tests
1m 22s
Build ClickHouse monitor image to be used for Kind e2e tests
Build ClickHouse server image to be used for Kind e2e tests
3m 12s
Build ClickHouse server image to be used for Kind e2e tests
Build Spark Jobs image to be used for Kind e2e tests
6m 10s
Build Spark Jobs image to be used for Kind e2e tests
Build Theia Manager image to be used for Kind e2e tests
3m 4s
Build Theia Manager image to be used for Kind e2e tests
Migrate ClickHouse from Theia version N-1
5m 20s
Migrate ClickHouse from Theia version N-1
E2e tests on a Kind cluster on Linux
2m 16s
E2e tests on a Kind cluster on Linux
Upgrade from Theia version N-1
1m 17s
Upgrade from Theia version N-1
Delete uploaded images
0s
Delete uploaded images
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Upgrade from Theia version N-1
Process completed with exit code 2.
Upgrade from Theia version N-1
Process completed with exit code 1.
E2e tests on a Kind cluster on Linux
The run was canceled by @github-actions.
E2e tests on a Kind cluster on Linux
The operation was canceled.
Migrate ClickHouse from Theia version N-1
The run was canceled by @github-actions.
Migrate ClickHouse from Theia version N-1
The operation was canceled.

Artifacts

Produced during runtime
Name Size
clickhouse-monitor Expired
83.8 MB
clickhouse-server Expired
845 MB
spark-jobs Expired
1.39 GB
theia-manager Expired
155 MB
upgrade-from-theia-version-n-1.tar.gz Expired
45 Bytes