Fixing upgrade N-1 error #1930
kind.yml
on: pull_request
Check whether tests need to be run based on diff
19s
Build ClickHouse monitor image to be used for Kind e2e tests
1m 7s
Build ClickHouse server image to be used for Kind e2e tests
3m 13s
Build Spark Jobs image to be used for Kind e2e tests
7m 17s
Build Theia Manager image to be used for Kind e2e tests
3m 20s
E2e tests on a Kind cluster on Linux
21m 54s
Upgrade from Theia version N-1
2m 29s
Delete uploaded images
0s
Annotations
4 errors
Upgrade from Theia version N-1
Process completed with exit code 1.
|
Upgrade from Theia version N-1
Process completed with exit code 2.
|
E2e tests on a Kind cluster on Linux
The run was canceled by @github-actions.
|
E2e tests on a Kind cluster on Linux
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
clickhouse-monitor
Expired
|
83.8 MB |
|
clickhouse-server
Expired
|
845 MB |
|
spark-jobs
Expired
|
1.39 GB |
|
theia-manager
Expired
|
155 MB |
|
upgrade-from-theia-version-n-1.tar.gz
Expired
|
45 Bytes |
|