Fixing upgrade N-1 error #1960

Fixing upgrade N-1 error

Fixing upgrade N-1 error #1960

Triggered via pull request July 25, 2023 23:48
Status Cancelled
Total duration 3m 48s
Artifacts

go.yml

on: pull_request
Check whether tests need to be run based on diff
16s
Check whether tests need to be run based on diff
Check whether snowflake tests need to be run based on diff
16s
Check whether snowflake tests need to be run based on diff
Verify docs and spelling
22s
Verify docs and spelling
Check tidy and manifest
1m 9s
Check tidy and manifest
Matrix: Golangci-lint
Matrix: Unit test
Matrix: Unit test snowflake
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Unit test (ubuntu-latest)
The run was canceled by @github-actions.
Unit test (ubuntu-latest)
The operation was canceled.
Golangci-lint (ubuntu-latest)
The run was canceled by @github-actions.
Golangci-lint (ubuntu-latest)
The operation was canceled.