Skip to content

Update go to v1.20 #1802

Update go to v1.20

Update go to v1.20 #1802

Triggered via pull request July 17, 2023 16:41
Status Failure
Total duration 4m 45s
Artifacts

go.yml

on: pull_request
Check whether tests need to be run based on diff
24s
Check whether tests need to be run based on diff
Check whether snowflake tests need to be run based on diff
25s
Check whether snowflake tests need to be run based on diff
Verify docs and spelling
48s
Verify docs and spelling
Check tidy and manifest
18s
Check tidy and manifest
Matrix: Golangci-lint
Matrix: Unit test
Matrix: Unit test snowflake
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Golangci-lint (macos-latest)
Process completed with exit code 2.
Golangci-lint (ubuntu-latest)
The job was canceled because "macos-latest" failed.
Golangci-lint (ubuntu-latest)
The operation was canceled.
Unit test (ubuntu-latest)
Process completed with exit code 2.