Skip to content

Commit

Permalink
Update scs-0119-w1-Availability-Zones-Standard.md
Browse files Browse the repository at this point in the history
Signed-off-by: josephineSei <[email protected]>
  • Loading branch information
josephineSei committed Sep 30, 2024
1 parent efd2ab5 commit 58d636a
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion Standards/scs-0119-w1-Availability-Zones-Standard.md
Original file line number Diff line number Diff line change
Expand Up @@ -38,5 +38,5 @@ It is still required to document the existence of fire zones and the correct con

## Physical Audits

In cases where it is reasonable to mistrust the provided documentation, a physical audit by a natural person - called auditor - send by the OSBA (?) should be performed.
In cases where it is reasonable to mistrust the provided documentation, a physical audit by a natural person - called auditor - send by e.g. the [OSBA](https://osb-alliance.de/) should be performed.
The CSP of the deployment, which needs such an audit, should grant access to the auditor to the physical infrastructure and should show them all necessary IaaS-Layer configurations, that are needed to verify compliance to this standard.

0 comments on commit 58d636a

Please sign in to comment.