You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
available project status: "operational", "under construction", "planned", ("decommissioned", "suspended")
Assumptions + data preparation:
slow technology: potential new power plants that are not yet under construction won't be operational in 2030
if decommissioning date empty, assume no decommissioning before 2030
remove entries without announced capacities or start date
remove data of country "Unknown"
use project types: "Full chain", "Storage", "T&S"
no projects are under way in Brasil which means all thresholds are equal to avoid this, add manually an upper estimate of what could still be planned in BRA
projects shared between multiple countries are allocated according to GDP
Threshold definitions:
2020
global min_red: -10% ("operational") ; regional min_red: -40% ("operational")
global min_yel: -5% ("operational") ; regional min_yel: -20% ("operational")
global max_yel: +5% ("operational") ; regional max_yel: +20% ("operational")
global max_red: +10% ("operational") ; regional max_red: +40% ("operational")
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Variable:
Carbon Capture|Storage
Source: IEA-CCUS-Database 2024
Assumptions + data preparation:
Threshold definitions:
2020
min_red
: -10% ("operational") ; regionalmin_red
: -40% ("operational")min_yel
: -5% ("operational") ; regionalmin_yel
: -20% ("operational")max_yel
: +5% ("operational") ; regionalmax_yel
: +20% ("operational")max_red
: +10% ("operational") ; regionalmax_red
: +40% ("operational")2025
min_red
: -10% ("operational" * 0.9)min_yel
: -5% ("operational" + "construction" * 0.2) ; regionalmin_yel
: -40% ("operational" + "construction" * 0.2)max_yel
: +5% ("operational" + "construction" +"planned" * 0.2) ; regionalmax_yel
: +40% ("operational" + "construction" +"planned" * 0.2)max_red
: +10% ("operational" + "construction" +"planned")2030
min_red
: -10% ("operational")min_yel
: -5% ("operational" + "construction" * 0.5) ; regionalmin_yel
: -40% ("operational" + "construction" * 0.5)max_yel
: +5% ("operational" + "construction" +"planned" * 0.2) ; regionalmax_yel
: +40% ("operational" + "construction" +"planned" * 0.2)max_red
: +10% ("operational" + "construction" +"planned")Data Source:
https://www.iea.org/data-and-statistics/data-product/ccus-projects-database
Beta Was this translation helpful? Give feedback.
All reactions