UASB Fall 2019 Goals: #150

Open
cjmsmith opened this issue Aug 9, 2019 · 0 comments
Open

UASB Fall 2019 Goals: #150

cjmsmith opened this issue Aug 9, 2019 · 0 comments

Comments

@cjmsmith
Copy link
Contributor

cjmsmith commented Aug 9, 2019

  • Get drainage system for the UASB reactor up and running. Figure out tubing sizes for drainage. Get system hooked up to wastewater supply so we can put effluent water back into the wastewater plant for treatment.
  • Hook up biogas capture to reactor (NO flexible tubing)
  • Figure out how to measure the amount of biogas coming from reactor (i.e. figure out how to use wet test meter?)
  • Figure out how to test quality of effluent wastewater coming out of the UASB

Once all of this done, we can populate reactor with sludge granules and get wastewater running through the reactor.

Things that can also be done...

  • Reassemble + fix white UASB reactor and get that set up at the IAWWTF
  • Order stronger parts for tipping bucket to the prevent screws from breaking from sheer
  • Look into less expensive parts for future reactors (Ed Gottlieb noted a few things, e.g. the bolts for the flanges, are stronger than necessary and we could get away with something weaker and therefore less expensive).

Our abstract for the NEGSWS confrence was also accepted, so we need to make a poster for that before September 7th.